10 Questions to Ask a Kitchen Remodel Contractor

Ten questions to ask before hiring a kitchen remodeling team, from written scope and permits to allowances, changes and closeout.

Modern kitchen with dark cabinetry, wood accents, built-in ovens, pendant lights, and cove ceiling lighting.

Before a kitchen remodel begins, ask more than what the finished room will look like. The written scope, design responsibilities, existing conditions and decision process affect what happens after work starts. Use these ten questions when comparing a kitchen remodeling contractor or design-build team. They also help if the kitchen is part of a larger renovation or new custom home.

1. What work is included in the proposal?

Ask the team to identify demolition, layout changes, cabinetry, countertops, flooring, fixtures, appliance installation, electrical, plumbing, ventilation and finish work that are included. What will you buy separately? What is specifically excluded? Two proposals can have similar totals while covering different work, so compare them against the same drawings and specifications.

2. Who is responsible for design, engineering and permits?

Find out who prepares drawings, checks structural or building-system changes, submits permit documents if required, responds to review comments, and arranges inspections. The answer depends on the actual scope and local rules. Ask for each role to be identified in the agreement instead of assuming that “full service” covers every task.

3. What do we know about the existing kitchen?

In an existing home, ask what has been checked behind the visible finishes and what remains uncertain. Wall construction, floor levels, plumbing, electrical capacity and ventilation routes may affect the plan once investigated. Ask how the team will document a newly discovered condition, explain options and get approval before related work proceeds.

4. How will the proposed layout be tested?

Review the path from groceries to storage, prep to cooking, and dishes to cleanup. Ask to see cabinet and appliance door swings, island seating, walkways and clearances on the drawings. If the kitchen opens to dining or living areas, test those connections too. A rendering conveys the look; dimensioned plans help the team evaluate whether the room will work.

5. When must appliances and fixtures be selected?

Ask which appliance dimensions, sink and faucet choices, and ventilation equipment the team needs before cabinetry and utility locations are finalized. A late model change can affect openings, connections and installation details. Find out which decisions can wait and which are on the project's critical path.

6. How are cabinetry and finish choices documented?

Ask for drawings or schedules that identify cabinet storage, materials, hardware, countertops, backsplash, flooring and lighting selections. Which items will be reviewed as physical samples? Who records approvals, and how are substitutions checked against the original choice? A clear selection record helps design, purchasing and construction stay aligned.

7. What allowances and exclusions affect the price?

Review the written estimate for allowances, owner purchases, permit fees, delivery, disposal and work in adjacent rooms. Ask what assumptions support each amount and when a firmer price will be available. There is no universal contingency percentage that fits every kitchen; the reserve should reflect the house, scope and unresolved conditions. Compare what each proposal actually includes before relying on the total.

8. What is the schedule based on?

Ask how design decisions, permit review, procurement, demolition, construction and inspections fit together. Which materials need to be ordered before work starts? What site access is needed, and how will the household use the home while the kitchen is unavailable? The schedule should state its assumptions and explain how changes or delays will be communicated.

9. How are changes proposed and approved?

Find out who can request a change, how its cost and schedule effect will be described, and who must approve it before the work proceeds. This matters for owner selections, concealed conditions and agency-required revisions. Keep the process in writing so a verbal discussion does not become an untracked decision.

10. What happens at completion?

Ask how the team handles the final walkthrough, outstanding items, care instructions, product information, warranty documents and any required final approvals. Identify the day-to-day contact during construction and the person to call after handover. A kitchen is a long-lived part of the home; useful records make maintenance and later work easier.

Start with a clear scope

These questions help you evaluate a real proposal; the project team still needs to assess your property. Greenberg Construction coordinates design and construction for substantial remodels and additions and new custom homes. You can review materials at the Palo Alto showroom or share your kitchen plans with the team.